A pavement concession is required for any aircraft with a maximum take-off weight (MTOW) greater than 5,700kg.

If a pavement concession is required, a Pavement Concession Application form must be completed and provided to Jandakot Airport Holdings a minimum of 2 working days prior to the planned aircraft arrival date.  The application will be assessed on the basis of pavement strengths and surface characteristics only, and approval may be withdrawn at any time should pavement damage occur.